top of page

Master Planning

Dubai Parks Masterplan

DJI_0441_1.gif
1412-Dubai-Park-MP-(8).gif

Location: Jebel Ali, Dubai, UAE

Year: 2014

In Conjunction with RHDO/ HOK

 

Leading the process as vice president of design for Meraas/ DXBE from selecting the site to working with Rabben/Herman Design Office on the master planning and through to IPO preparation and to the end of construction stationed on site.

 

The first phase master plan includes five gated themed attractions, two commercial developments, two hotels and supporting facilities. In addition, are a series of access roads, two parking structures and three large surface parking lots (one of which is temporary), and a major open space system. The entire site which includes three more theme parks and four more hotels will be developed in phases over a period of up to 20 years.

Saadiyat Masterplan

0705-Saadiyat-Island-MP--(3).gif

Location: Abu Dhabi, UAE

Year: 2006

In Conjunction with AECOM

The masterplan was redesigned from an earlier Gensler draft working with EDAW AECOM Melbourne, London, HK & Abu Dhabi offices, and for the CEO of TDIC (Abu Dhabi Tourism Development and Investment Corp).

 

The 145000 inhabitant master plan is for a 27 square kilometers island, and included five new urban districts, emphasizing sustainability and place-making.

Located at the Western end of the island the 2.43 sq km Cultural District occupies not much more than 10 per cent of the total area of the project. The GBP 85 million district includes the Louvre museum, the Guggenheim Abu Dhabi, the Sheikh Zayed National Museum and the Abu Dhabi Performing Arts Center.

0705-Saadiyat-Island-MP-11.gif

Dubai 2020 Masterplan

virginia-duran-blog-10-sites-to-take-the

Location: Dubai, UAE

Year: 2010

In Conjunction with Dubai Municipality & AECOM

 

1008-Dubai-2020-(1).gif

Dubai 2021 Plan

1403-2021-Dubai-Plan-(11).gif

Location: Dubai, UAE

Year: 2014

In Conjunction with the Executive Council

 

2021 Dubai Plan Interview

Dubai 2021, Video link, Morne Fourie, Design, Dubai, Urban Design, Public Participation, Masterplanning, Architect, Advisor, Dubai Masterplan

Umm Lefeenah Master Plan

0925-Harbor-Island-Presentation-Design-(

Location: Abu Dhabi, UAE

Year: 2009

In Conjunction with Meraas Northpoint DALIN Group, KPF & AS+GG

0924-Umm-Lefeenah-Master-Plan-(52).gif

Jumeirah Garden City

0801-Jumeirah-Gardens-MP-(3).gif
0801-Jumeirah-Gardens-MP-(13).gif

Location: Satwa, Al Wasl & Jumeirah Dubai UAE

Year: 2008-2010

In conjunction with Meraas & SOM

 

The masterplan called for the urban regeneration of the Satwa area. With sustainable technology, public transit and careful integration into the existing fabric, the masterplan lead to the eventual development of the Dubai Canal, Jamuna Island, La Mer and Pearl Jumeirah. The initial budget was 27 billion dollars to be spent over the life span of the project. The BUA was 22 million sqm of which 3.5 million is located on a series of 6 new islands planned off the coast of Dubai.

‘1 Dubai’ is the first and most important tower concept developed in the masterplan in conjunction with design consultants AS+GG.

‘Super 6’ developed in conjunction with SOM was the working title given to the first six urban blocks that Meraas developed as part of the Jumeirah Gardens East Park area. It consists of 6 Dubai city blocks on which the design team developed a Canary Warf like down town commercial mixed use district.

‘Meraas One’ had Adrian Smith & Gordon Gill as lead consultant. The first 33 stories of this 101 story tower consist of the hotel programming, the 39rd to 82nd consist of office floors, and 88th to 98th floors are apartments.

Al Reem Place Masterplan

0859 Al Reem Place MP (5).JPG

Location: Abu Dhabi, UAE

Year: 2009

In Conjunction with Meraas & SOM

0859-Al-Reem-Place-MP-(0).gif

Hangzhou Vanke CBD Masterplan

0508-Hangzhou-Vanke-CBD-(31)_w.gif
0508 Hangzhou Vanke CBD (44).jpg

Location : Hangzhou, PR China

Year : 2005

Client : Vantone

In conjunction with Cox

 

Worked with Cox Group Sydney The Vantone Groups first project outside Northern China, the Hangzhou CBD was an ambitious new Mixed Use TOD with Shopping Centers, Hotels, Office Towers, Museums, Parks and Residential Towers at the Grand Channel mouth, linking Beijing with Hangzhou.

The site is due north of the Hangzhou old centre and lake, abutting to the west where the Shangtang elevated road swings north, the north of Daguan Road and the south of Dengyun Road. The 4th edge of the site is the Lishui Road. 


The site is linked via the grant canal to the north, a fact of historic importance with the old town across the canal around Xiaohezhi Street. 


The Hangzhou government did not want Vantone, our client to develop the canal front with highrise buildings. 


Mid-rise residential with an organic footprint is placed on the canal front. The density is concentrated around the elevated road on the far side of the site (eastern section), linking the the wider city’s transit system.

Ras Al Hikma Egypt Masterplan

0702-Ras-Al-Hikma-Egypt-04_watercolor.gi

Location: North Egypt

Year: 2007

In Conjunction with SAMA Dubai & EDAW AECOM

0702-Ras-Al-Hikma-Egypt-01.gif

Umm Al Quwain Marina Masterplan

0712 Umm Al Quwain Marina (21)_watercolo

Location: Umm Al Quwain UAE

Year: 2007

In Conjunction with EMAAR & EDAW AECOM

0712-Umm-Al-Quwain-Marina-(2)_watercolor

Canal City Phase 1 Masterplan

0849-Canal-City-Phase-1-(4)_watercolor.g

Location: Dubai UAE

Year: 2008

In Conjunction with Meraas & KPF

0849-Canal-City-Phase-1-(11).gif

Jebel Ali Race Course Masterplan

0850-Jabal-Ali-Race-Course-(5).gif

Location: Dubai UAE

Year: 2008

In Conjunction with Meraas & Burt Hill

00850-Jabal-Ali-Race-Course-(14).gif

Canal City Masterplan

0884-Canal-City-Overall-MP-(4).gif
0884 Canal City Overall MP (8).jpg
0884 Canal City Overall MP (9).jpg

Location: Dubai UAE

Year: 2008

In Conjunction with Meraas & KPF

bottom of page